Monitoring of ecological systems in 2018 was carried out by specialists of Ecoexpert LLP and specialists of Karkaralinsk SNPP The monitoring works included snow survey and snow sampling in March 2018. Air quality measurements during the growing season April-October 2018. Water sampling and hydrological observations. Soil sampling. Gamma survey of the area. The works were carried out at 10 key sites. Selection of observation sites was carried out by specialists of the scientific department of the State Institution Karkaralinsk SNPP.
Observations of the fauna of Karkaralinsk National Park consisted in the installation of camera traps. The camera traps were installed for the period from the end of May to August 2018. Geobotanical surveys were carried out during the summer period.
A report was prepared based on the results of the work performed.
The report materials contain general information about the object of work, technical information about the works performed, results and conclusions.
